DAILONG (2x50 kW) MICRO-HYDEL PROJECT, Tamenglong District
 

PROJECT AT A GLANCE

 

1. Project title                            :  Dailong Micro Hydel Project (2 x 50) kW, Dailong Village, Tamenglong District, Manipur.
2. Broad discipline                     :  Multi Engineering Discipline covering Civil, Electrical, Electronics and Mechanical Engineering.
3. Project  cost                          : Rs. 1,01,25,819/-
      i) DST, GoI Share                : Rs 91,13,237/-
     ii) State Share                       : Rs  10,12,582/-

4. Implementing agency              : Manipur Science & Technology Council Central jail Road, Imphal – 795001.
5.  Sponsoring agencies              : i) S&T Council Division, DST, GOI ,
                                                   ii) DST, Govt. of Manipur 

1.0 Abstract of the Project:
            Micro Hydel Power Generation is a viable alternative to extension of grid lines in rural/remote/hilly areas. To exploit micro hydel potential on large scale, it is necessary to develop cross-flow turbine suitable for (2 x 50) kW and more for installation on the rivers/streams  in the hills.. Since there is a very good perennial source of water in the   Zoulangpang river, Dailong Village, Tamenglong District, therefore cross-flow turbine is an ideal option to meet the site conditions in the implementation of such schemes in the State of Manipur

1.1 Advantages of Cross-flow Turbine:
  1. Good efficiency even on part loading conditions.
  2. Need for thrust bearing is eliminated since the discharge crosses through the turbine.
  3. Manufacture and erection of the turbine is easy.
  4. Because of less weight, transportation of cross-flow turbines is easier.
  5. Since the discharge crosses through the turbine, it adds up to self-cleaning property to the turbine.
  6. Suitable for wide range of flow and head.

2.0 Project Site :
The project was implemented at Dailong village, Tamenglong District, Manipur over the Zoulangpang Stream. Dailong viallage is situated at about 160 km from the State Capital, Imphal and 12 kms from Tamenglong District Headquarters towards Tamei in the Tamenglong-Tamei Road.

2.1 Village Details :
            i)  Village                                  : Dailong
            ii)  Block                                  : Tamenglong
            iii)  District                                : Tamenglong
            iv)   State                                  : Manipur
            v)    Height above M.S.L.         : 1055 m
            vi) Total Population                   :1860
            vii) Total Households                : 130
            viii) Total Geographical Area     : 32 Ha
            ix)    Total cropped area           : 51 Ha
            x)      Total irrigated area           : Rainfed
            xi)    Motorable Road               : Right upto the village
            xii)   Stream/River                     : Zoulangpang
            xiii)  Electricity Line                   : Very erratic, very low voltage electricity from            
                                                                State Electricity Dept.
            xix)   Sub health centre  : At the village
            xv)    School                             : 1(One) Primary School
            xvi)   Tank/Pond                       : Nil
            xvii)   Well                                : Nil
            xviii)  Post office                       : at Tamenglong H.Q.
            xix)    Market                           : at Tamenglong H.Q.
            xx)      Police Station                 : at Tamenglong H.Q.

2.2  Details of the Stream :
            i) Name of the stream               : Zoulangpang
            ii) Months during which
                water flows                           : Perrennial (Peak period : May-November)
            iii) Average discharge                : 180 lps
            iv)  Catchment area                   : 4.75 sq.km.   

3.0 Objectives of the Project:
  1. To design and develop the cross-flow turbine packages suitable for (2 x 50) kW capacities. The packages consist of turbines and electronic load controllers for a micro hydel station at Dailong Village.
  2. To study the problems of and set guidelines for installation, operation, maintenance and energy utilisation associated with micro hydel units in remote hilly terrains. Micro hydel units are environmentally clean and eco-friendly and are ideally suited to decentralised power generation.

3.1 Design Parameters:

  1. Installed capacity         : 2 x 50 kW
  2. Design head                 : 105 m
  3. Design discharge          : 180 lps

3.2 Power generation:
            i) Installed capacity       : 2x50 kW
            ii) Power (potential)
                Generation (based    : 80 kW.
                on 80% efficiency)

            iii) Actual Power Generated : 96 kW
             
3.3 Cost of generation   : Rs. 1.28/kW

4.0 Project Summary :
            The project was started on March 31, 2000 and commissioned during February, 2010. The project was inaugurated on the 20th September, 2010 by Shri L.P. Gonmei, Principal Secretary (Power), Govt. of Manipur with a formal Inaugural Function presided over by Shri H. Imocha Singh, Commissioner (Science & Technology), Govt. of Manipur. Shri K. Panmei, Deputy Commissioner, Tamenglong District was the Honour Guest of the Function. Various officials from Tamenglong District Headquarter and State Power Department also attended the Inaugural Function.


| Dev. of Technology | Manipur at a Glance | Industrial Scenario | Market Organisation | Natural Resources | Human Resource |

| Technology sources | Technology for transfer by MASTEC | Local Technology in Manipur | Banking and Finance | Grant makers |

| Entrepreneurship development | Industrial Consultancy of NE | State Govt. Departments | Other useful websites |

| Contact us | About TBIS | About MASTEC | Current News | Home |